The 2025-2027 Three-Year Plan Pavement Management Plan (“Plan”) is based on a full network inventory and field assessment conducted in late 2024 and early 2025. This assessment included evaluation of pavement conditions, preliminary curb ramp review, and preservation treatment recommendations for each roadway segment in the City’s network. The Plan provides the framework for strategic...
Beginning the week of December 8, 2025, Michael Paul Company will be upgrading the sewer system in the Los Ranchitos Park restroom located at 20 Sequoia Road for the City of San Rafael. Work will take place between the hours of 8am and 5pm, Monday through Friday. The Project should be completed within two weeks...
PG&E’s subcontractor, Pinnacle Power Services , will be closing the road near 49 Marquard Ave to perform maintenance on their overhead utilities. The closure will happen Thursday, 12/4, between approximately 9am – 4pm. They have an approved encroachment permit EP-25-217 and affected properties have also been notified.
On October 24th, 2025, contractor Michael Paul Company, Inc. finished a project to replace 10 feet of 12-inch corrugated metal pipe (CMP) with 12-inch high-density polyethylene (HDPE) pipe at Belvedere St near Louise St. This section of the stormwater pipe was damaged, trapping debris and causing a blockage. The CMP repairs and replacement work is...
PG&E’s subcontractor, Core Tree Care, will be working at the locations listed below. This work will be done the week of 11/3 – 11/7. Public inquires can be addressed by the contractor: John Ball, Core Tree Care 559-944-9459. LOT Street 42 Grove ST. 7 MLISS LN 83 BRET HARTE RD 52 GLENAIRE DR 222-230 REDDING...
PG&E’s subcontractor Pinnacle Power Services will be closing the road near 270 Bret Harte Rd to replace an anchor for the utility pole. The closure will happen Monday, 10/27, between approximately 9am-3pm. They have an approved encroachment permit EP-25-99 and affected properties have been notified.
PG&E’s subcontractor, Core Tree Care, will be working at the locations listed below. This work will be done the week of 10/27 – 10/31. Public inquires can be addressed by the contractor: John Ball, Core Tree Care 559-944-9459. LOT Street 10 LINCOLN CT. 112 K ST. 222 REDDING WAY 46 BLOSSOM DR 21 ST. FRANCIS...
We are excited to share that new playground equipment has been installed at Boyd Memorial Park! The toddler-focused play features and fresh wood fiber maintain the look and under-five focus of the previous play structure, while also adding popular, more accessible elements such as swings, spinners, and musical play pieces. We’re thrilled to bring this...
Our Engineering Team has created a new flyer! Inside, you’ll discover how the team is organized and an overview of what each division does. We look forward to sharing this brochure with you at city events! (click the image to view the brochure.) You can also learn...
PG&E will be working at night and closing the road on Grand Ave at Lincoln Ave to work on upgrading their gas system. One travel lane on Lincoln Ave will also be closed at the intersection of Grand Ave and Lincoln Ave. Vehicles traveling on Lincoln Ave will still be able to maintain access, including...
MMWD (Marin Municipal Water District) will be working near 2123 Francisco Blvd to finish repairing a water leak in the area. The work will happen tonight, 9/19/25 from approximately 7pm – 10pm. They have an approved encroachment permit (EP-25-385) and notifications have been sent out to affected properties. Work only requires a lane closure so...
PG&E will be working and closing the road on St Francis Ln at Palm Ave to conduct electrical work. The closure will happen Friday, 9/19, between 9am-3pm. They have an approved encroachment permit EP2401-023, and affected properties have been notified.
A contractor will be closing the road at 41 Miraflores Ave to do a concrete pour for a retaining wall. This closure will happen Monday, 9/15 from 9am-3pm. The contractor has an approved encroachment permit, EP-25-387, and building permit, B2503-169. Affected residents have been notified.
The Dept of Public Works recently posted the Plans and Specifications for the Lincoln Ave. Safety Improvement project. They can be viewed by clicking the links below or by visiting the project's website. Links to newly uploaded documents: Project Plans Project Specifications We will continue to post updates as the project progresses, but please...
California Assembly Bill 43 (AB 43), signed into law in October 2021, requires Engineering and Traffic Surveys (E&TS) reports to consider the presence and safety of vulnerable roadway users, such as bicyclists and pedestrians, when establishing speed limits. AB 43 provides local jurisdictions with more flexibility to reduce speed limits along roadways that meet certain characteristics such as safety...
Construction of a new HAWK (High-Intensity Activated Crosswalk), also known as a Pedestrian Hybrid Beacon (PHB), at Grand Avenue is anticipated to begin September 15, 2025. This project is a collaboration between Canal Alliance and the City of San Rafael to provide a safe path of travel across Grand Ave to and from the new...
PG&E subcontractors will be performing a pole replacement job and will be closing the road at 260 Bungalow Ave. This closure will happen Monday, 9/8 from 9am-3pm. The contractor has an approved permit, EP-25-253. Affected residents have been notified.
PG&E’s subcontractor, Core Tree Care, will be working at the locations listed below. This work will be done the week of 8/18-8/22. Public inquires can be addressed by the contractor: John Ball, Core Tree Care 559-944-9459. LOT Street City 16 ESTATES CT SAN RAFAEL 504 BRET HARTE RD SAN RAFAEL 69 OAK AVE SAN...
PG&E will be working at night and closing the road on Grand Ave at Lincoln Ave to work on upgrading their gas system. One travel lane on Lincoln Ave will also be closed at the intersection of Grand Ave and Lincoln Ave. Vehicles traveling on Lincoln Ave will still be able to maintain access, including...
R.V Stitch Construction will be working at night and closing the road on Mission Ave between Lincoln Ave and Garden Ln to restore asphalt in front of the 800 Mission property. One travel lane on Lincoln will also be closed between Laurel Pl and Mission Ave to perform the work. Vehicles will be directed to...
PG&E will be conducting night work near 1235 Grand Ave to repair a gas leak in the area. The work will happen on 8/7 between 9pm-5am. They have an approved encroachment permit (EP2503-003) and notifications have been sent out to affected properties. Please note this work is being done at night to minimize disruptions to...
PG&E’s subcontractor, Edison Power, will be returning to conduct underground electrical work near 169 San Marino Dr. They have notified us that there will be another closure Friday, 8/1, between approximately 9am – 4pm. They have an approved encroachment permit EP2503-045 and affected properties have also been notified.
PG&E’s subcontractor, Core Tree Care, will be working at the locations listed below. This work will be done the week of 7/28 – 8/1. Public inquires can be addressed by the contractor: John Ball, Core Tree Care 559-944-9459. LOT Street City 21 Solar Ct. San Rafael 100 Dubois St. San Rafael 656 Knocknaboul Way San...
PG&E will be working at night on 3rd St near the intersection of 3rd and Lincoln to perform gas infrastructure maintenance and restore asphalt. The work is schedule on Monday 7/21/25 from approximately 10PM to 5AM. The work is happening at night to minimize traffic impacts and the current pavement conditions have accelerated the timeline. The work will...
PG&E’s subcontractor, Edison Power, will be closing the road near 169 San Marino Dr to perform underground electrical maintenance. The closure will happen Friday, 7/18, between approximately 9am – 4pm. They have an approved encroachment permit EP2503-045 and affected properties have also been notified.
PG&E’s subcontractor, Edison Power, will be closing the road near 141 Terrace Ave to perform overhead electrical work. The closure will happen Monday, 7/7, between approximately 9am – 3pm. They have an approved encroachment permit EP-25-39 and affected properties have also been notified.
Rohin Young We’re happy to introduce our new Dean Allison Intern, Rohin Young, who will be working with the Public Works Department this summer. Rohin joins us from Cal Poly, San Luis Obispo —where he just completed his second year studying Urban Planning, with minors in Architecture and Real Property Development. As a Bay Area...
On Monday, June 23, 2025 the San Rafael City Council approved the use of up to $500,000 in City funds to support the purchase of the property located at 620 Canal Street for future public uses. The 1.65-acre site is located along the southern edge of the San Rafael Creek (Canal) and is a potential...
MMWD will be closing the road near 193 Prospect Dr to continue repairing a water main leak. The closure will happen Wednesday, 6/25, between approximately 9am – 4pm. They have an approved encroachment permit EP-25-77 and affected properties have also been notified.
PG&E’s subcontractor, Core Tree Care, will be working at the locations listed below. This work will be done the week of 6/23 – 6/27. Public inquires can be addressed by the contractor: John Ball, Core Tree Care 559-944-9459. LOT Street 45 OAK AVE 56 MARTENS LVD 127 GREENWOOD AVE 229 CLORINDA AVE 16 UPPER FREMONT...
PG&E’s subcontractor, WK McClellan, will be working at night to restore asphalt on 2nd St. The work is schedule on Tuesday, 6/17 from approximately 8PM to 5AM Wednesday, 6/18. The work is happening at night to minimize traffic impacts. The work will only require no more than 2 travel lanes to be closed at a time so...
6/17/25: Virtual Community Engagement Meeting Join us on Tuesday, June 17th, from 12 pm to 1 pm on Zoom to learn about the plan, ask questions, and share feedback directly with the City’s Bicycle and Pedestrian Plan (CBPP) team. Login information for this event can be found on our upcoming events website: www.cityofsanrafael.org/question/join-us-at-upcoming-in-person-outreach-events Spanish interpretation...
PG&E’s subcontractor, Core Tree Care, will be working at the locations listed below. This work will be done the week of 5/27 – 5/30. Public inquires can be addressed by the contractor: John Ball, Core Tree Care at 559-944-9459. LOT Street 740 Francisco Blvd W 910 Andersen Dr 61 Jordan St 625 Du Bois St...
Caltrans’s contractor, Ghilotti Bros, will be working at night to continue constructing the roundabout improvements at the Freitas Pkwy and Civic Center Dr intersection. The night work is scheduled for Tuesday, 5/27 from 8pm to 5am. The work will only require lane closures so traffic will still be able to get through the area. Additional information on...
Due to a PG&E outage, there are several intersections in downtown San Rafael where the traffic lights/signals are out. These areas include intersections along 4th St and near the West End. We have confirmation from our technicians that power has been restored to the intersection of 4th St and D St and areas along 3rd...
PG&E’s subcontractor, Core Tree Care, will be working at the locations listed below. This work will be done the week of 5/19 – 5/23. Public inquires can be addressed by the contractor: John Ball, Core Tree Care at 559-944-9459. LOT Street 740 FRANCISCO BLVD W 910 ANDERSEN DR 61 JORDAN ST 625 Du Bois St...
PG&E will be closing the road near 201 Linden Ln to perform overhead electrical maintenance. The closure will happen Tuesday, 5/20, between approximately 9am – 2pm. They have an approved encroachment permit EP2412-074 and affected properties have also been notified.
San Rafael's Bicycle and Pedestrian Master Plan is hosting an Open House and Workshop Join us on Wednesday, May 14, from 5–7 PM at the San Rafael Community Center (618 B St) for an in-person open house. Attendees can walk through different stations to learn about the plan update’s goals and provide feedback on...
PG&E’s subcontractor, Edison Power, will be performing night work on a power pole near 963 Grand Ave. The work is scheduled for Sunday, 5/11 and Monday 5/12 from 8PM to 5AM. The work requires power to be temporarily shut off and the is happening at night to minimize disruption to the businesses in the area....
PG&E’s subcontractor, Core Tree Care, will be working at the locations listed below. This work will be done the week of 5/5 – 5/9. Public inquires can be addressed by the contractor: John Ball, Core Tree Care 559-944-9459. LOT Street 740 FRANCISCO BLVD W 910 ANDERSEN DR 61 JORDAN ST 33 TWAIN HARTE LN...
The Department of Public Works is piloting a new online permitting system through OpenGov! Apply for permits here! https://cityofsanrafaelca.portal.opengov.com This user-friendly platform will make it easier for community members and contractors to find information and apply for the following permits: Encroachment Permits Grading Permits Transportation Permits Water Course and Tideland Permits Sidewalk Repair Program...
PG&E’s subcontractor, Core Tree Care, will be working at the locations listed below. This work will be done the week of 4/28 – 5/2. Public inquires can be addressed by the contractor: John Ball, Core Tree Care 559-944-9459. LOT Street 9 BLOSSOM DR 208 DU BOIS ST 20 D ST 76 D ST 103 C...
Peacock Gap Park construction is underway! The City’s Contractor, Rapid Grading Services Inc, completed the concrete work for the ADA parking stall on Peacock Drive and is working on the concrete paving between the two play areas and prepping the subgrade for the toddler play area. The main walking path through the park remains open...
The City’s contractor, Michael Paul Company, will be working at night from approximately 8pm – 5am to repair a storm drain in the left westbound lane on 3rd St in front of the San Rafael High School. Work is start Tuesday 4/22 and is expected to last 1-2 weeks. We currently anticipate work to be...
MMWD’s subcontractor WK McClellan will be working at night to restore asphalt near 901 Irwin St. The work is schedule on Thursday 4/24 from approximately 8PM to 3AM. The work requires two travel lanes to be closed on Irwin St between 3rd and 4th street and is happening at night to minimize congestion in the...
The left westbound lane on 3rd St in front of San Rafael High School is closed due to emergency repairs. We anticipate that the lane will remain closed through next week while the City completes the repairs. Staff will send any updates as they come.
PG&E will be closing the road near 250 Highland Ave to perform overhead electrical maintenance. The closure will happen Tuesday, 4/22, between approximately 9am – 4pm. The road closure will be happening in County jurisdiction but there will be traffic control signs within City jurisdiction. They have an approved encroachment permit EP2502-011 and affected properties...
Street Sweeping is scheduled for this Saturday, 4/19/25 beginning at 7am. The areas to be swept are Zones 8.1, 8.2, and 29: Zones 8.1 and 8.2 are scheduled between the hours of 7am and 10am Zone 29 is scheduled between the hours of 10am and 1pm. If possible, please do not park on the...