703 Third St.
Project Description
The project proposes to redevelop and consolidate two contiguous Downtown parcels, currently developed with existing one- and two-story commercial buildings and associated surface parking. The project proposes to construct a 6-story, 73’-tall, mixed-use building with 120 rental units or apartments above a 969 sq. ft. commercial space and 121 garage parking spaces, including 112 mechanical parking lifts.
The proposed configuration of the new residential apartments includes:
- 33, Studio units; 342-539 sq. ft. in size
- 44, 1-bedroom units; 525-795 sq. ft. in size
- 43, 2-bedroom units; 520-1,068 sq. ft. in size
The project proposes 9 affordable or ‘below-market-rate’ units (5 at the ‘very low-income’ household levels and 4 at the ‘low income’ household levels, which represents 20% of the maximum base density (45 units) allowed on the project site. By meeting the affordable housing requirement, the project is automatically granted a State Density Bonus of an additional 16 ‘market-rate’ units. The project requests; 1) An additional State Density Bonus of an additional 59 ‘market-rate’ units; 2) A height bonus of an additional 7’, from 66’ to 73’, under the State Density Bonus law; 3) Reduced parking rates under the State Density Bonus law; and 4) A waiver of the required 5’ front setback along Third St., under the State Density Bonus law. The project proposes to demolish the existing commercial buildings on the sites.
Project Applicant
Seagate Properties
Wick Polite
wick@seagateprop.com
Project Contact
Project Planner – Kristina Estudillo
(415) 458-5048
703Third@cityofsanrafael.org
Project Status
Approved
Project Timeline
Planning Application Submitted
3/1/2018
Application Under Review
Public Hearing
8/27/2019
Approved
Project Documents
All project documents can be accessed on the City's Permits and Records site as uploaded by the Property Owner or Owner's Representative.
Planning Application Materials - 8/20/2019
Current Project Plans (Submitted August 20, 2019)
Green House Gas Reduction Strategy Compliance Checklist 2018
Acoustical Study
Archaeological and Historic Review
Geotechnical Investigation Report
Air Quality Analysis
Phase 1 Environmental Site Assessment Part 1
Phase 1 Environmental Site Assessment Part 2
Preliminary Title Report Part 1
Preliminary Title Report Part 2
Traffic Study
Traffic Study Appendix A: Synchro Data - Existing Conditions