2020 Sewer Pipe Repair & Replacement Project – Phase 1 (Sanitation District)

About

Goals for project

  • Repair and replace existing sewer collection pipe infrastructure

Budget

Construction$319,000

Overview

This project comprises work on existing sewer pipes identified as needing repair and/or replacement at select locations throughout the City.  The work will include trenching and repairs at the following locations:

  • D Street from Ross Street to Bayview Street (day work)
  • Approximately 275-feet of trenching on Ross Street from the D Street intersection (day work)
  • Spot repairs on 2nd Street between Shaver Street and E Street (night work)
  • Spot repairs on 2nd Street between Lincoln Avenue and Francisco Blvd. West (night work)

Timeline

ConstructionJune 21, 2021 -

Project contact

Dave Nicholson | Project Manager/Senior Civil Engineer
David.Nicholson@cityofsanrafael.org
415.453.5369

Ben Shick, Schaaf & Wheeler Consulting Civil Engineers | Design Engineer 
BShick@swsv.com
707.528.4848

Rolando Calvo | Project Inspector
Rolando.Calvo@cityofsanrafael.org
415.485.3194