Terra Linda Pool

Project Description: Although the Terra Linda community pool was rebuilt in 2002, the pool house, which contains the restrooms, changing areas, classroom, mechanical room for pool equipment areas and storage, has not been upgraded since the 1960’s. This project included replacement, renovation and upgrades to the pool house. Project Status: The City has awarded the construction contract to … Continued

ADA/DOJ Curb Ramps 2015-2016

Project Description: This project includes installation of 9 American’s With Disability Act (ADA) compliant curb ramps, curb, gutter, sidewalk, and drainage improvements at the following intersections: Ida Street and Second Street Sonoma Street and Elaine Way Sonoma Street and Charlotte Drive Hoag Street and Mill Street Fairfax Street and Charlotte Drive Project Status: The construction contract was … Continued

Rossi Stormwater Pump Station Rehabilitation

Project Description: This project includes reconstruction of the pump station to ensure that the Stormwater Pump Station operates efficiently and effectively. The existing structure (concrete and supporting steel beams) and equipment (pumps, piping, brackets, electrical, fencing, and railings) will be replaced. The concrete wall will be removed and sidewalk will be widened. Curb, gutter, and … Continued

Street Resurfacing & Curb Ramps 2015-2016

Project Description: These two projects include installation of hot mix asphalt and/or micro-surfacing treatments at various locations throughout the City. This project also includes installation of American’s With Disability Act (ADA) compliant curb ramps, curb, gutter, and sidewalk. Curb ramps must be installed prior to resurfacing of streets per federal law. Project Status: The project was awarded to Ghilotti Construction Company. Construction of … Continued

Brookdale Avenue Retaining Wall

Project Description: Brookdale Avenue is a one-way loop off of Lincoln Avenue and adjacent to the Irwin Creek to the north.  The area next to the roadway has experienced erosion due to the close proximity of Irwin Creek as it meanders downstream.  The creek bank erosion has caused instability in the original stacked rock retaining wall … Continued

Francisco Blvd East and Francisco Blvd West Street Repairs (Removal of Bumps)

Project Description: This project consisted of street repairs to remove bumps that have formed on Francisco Blvd East between Medway Road and Vivian Street and on Francisco Blvd West near RAB Motors. In addition to the street repairs, other work items include minor draina ge improvements and removal and replacement of sidewalk, curb, gutter, and striping. … Continued

H Street Improvements

Project Description: This project made necessary repairs and improvements on H Street between 5th Ave and Forbes Ave. Improvements included installation of a new storm drain system, ADA compliant wheelchair ramps, and resurfacing of the roadway. Additionally, the City’s project, in conjunction with the San Rafael Sanitation District, included installation of a new sanitary sewer line. Project Status: … Continued

Multi-Use Pathway Repairs

Project Description: This project consisted of repairs on two multi-use pathways within the City: Shoreline Park Pathway and Bahia Vista School Pathway. The City applied for and received $252,000 under the Transportation Development Act (TDA) Article 3 funding source. The TDA grant is one of the few grants that provides funds for maintenance projects. Project Status: This … Continued

Safe Routes to School at Davidson Middle School

Project Description: This project addressed gaps and barriers in pedestrian facilities such that community members and students have better access to local schools, employment, services, and other activities that are considered essential to daily life. Improvements included installation of concrete sidewalks between Woodland Avenue and Andersen Drive; installation of radar speed feedback signs; and installation of … Continued

San Rafael Avenue Curb Ramps

Project Description: This project included installation of five American’s With Disability Act (ADA) compliant curb ramps, drainage improvements, curb, gutter, sidewalk, and the replacement of an existing retaining wall between Grove Street and Lodge Lane on San Rafael Avenue. Project Status: This project is complete. Construction began June 1, 2015 and was completed June 26, 2015. Project Contact: Jeff Stutsman, … Continued