Third Street Improvement Project – 05/26/2023 weekly update

Posted on May 26, 2023


The City of San Rafael will be sending out weekly project updates with construction updates, traffic

 closure updates, and other relevant information for this project. To receive these updates, please sign up using the form at the left-hand side of the project website.

THIS WEEK   May 22 – May 26

  • Construction crews replaced the sanitary sewer manhole on Third Street at Mary Street.
  • Crews pulled fiber optic cable along Third Street from Lootens Place to Shaver Street and along Second Street from Shaver Street to East Street.
  • Crews removed and replaced concrete curb ramps and sidewalk on Third Street from A Street to B Street.
  • Crews removed and replaced concrete sidewalk and constructed new tree wells on Third Street between A Street and E Street.

NEXT WEEK   May 29 – June 2

  • No work will be performed Monday in observance of the Memorial Day Holiday
  • Crews will pull fiber optic cable along Third Street from Lootens Place to Shaver Street and along Second Street from Shaver Street to East Street.
  • Crews will replace concrete ramps and sidewalk at 830 Third Street (Walgreens). The work will require a sidewalk closure and pedestrian detours.
  • Crews will replace sidewalk, curb and gutter and tree wells on Third Street from A Street to E Street. The work will require a lane closure and traffic lane shift.
  • Crews will replace the underground storm drainpipe crossing at Third Street west of B Street. The work will require a lane closure and traffic lane shift.
  • Crews will replace the sanitary sewer lateral main on Jessup Street and East Street. No parking will be posted and there will be short delays to local traffic.

IMPACTS:

  • The stairway from Second Street to Jessup Street (south of Ida Street) is closed.
  • For the Lane Shift on Second Street, the posted speed limit is 25 mph. Drivers should be aware of changed conditions and be alert.
  • Traffic Controls (temporary signs, message boards, traffic cones, delineators and detour signs) will be put in place to direct motorists through the work area.
  • Curb parking spaces will be marked “No Parking.”

The hours of work will be 6:00am – 6:00pm and lane closures 6:00am – 3:00pm on Third Street and Second Street westbound, and 9:00am – 6:00pm on Second Street eastbound.

 