2/16/18 – Street Resurfacing & Curb Ramps 2017-2018

Posted on February 16, 2018


Project Description: These two projects include installation of hot mix asphalt and/or micro-surfacing treatments at various locations throughout the City. This project also includes installation of American’s With Disability Act (ADA) compliant curb ramps, curb, gutter, and sidewalk. Curb ramps must be installed prior to resurfacing of streets per federal law.

Project Status: This project is in the design phase. Below is a list of roads that will potentially be a part of this project. This list is subject to change. Construction has begun and is anticipated to be completed by end of summer 2018.

Street NameFromTo
Bret Harte RoadCity LimitAltura Way
Altura WayCity LimitBret Harte Road
Bret Harte LaneBret Harte RoadBret Harte Road
M’Liss LaneBret Harte RoadEnd
Pacheco StreetLincoln AvenueStevens Place
Stevens PlacePacheco StreetEnd
Hibiscus WayHolly DriveHickory Lane
Pine LaneLas Raposas RdPenny Royal Lane
Penny Royal LanePine LaneLas Ovejas Avenue
Knight DriveAlderwood WayEnd
Bay CtBay WyEnd
Bay WyPt San Pedro RdEnd
Marian CourtKerner BlvdEnd
Makin GradeUpper Toyon DrEnd
Vivian PlaceFrancisco Blvd EastBelevedre Street
Allen CourtForbes AvEnd
Hubbell CourtJewell StEnd
Edward CourtPalm AvEnd
Elkin CourtSanta Margarita DrEnd
Thornwood TerraceTamarack DrTarragon Dr
Hyacinth WayHolly DrHickory Ln
Sandalwood CourtManuel T Freitas PkwyEnd
Maywood WayOne Way LoopOne Way Loop
Bellevue AvenuePt San Pedro RdEnd