Matched in attachment:
"... The major comments raised in these topic areas are
identified below, and followed by responses. ...Majority of project site is located in a relatively low risk zone (Safety Zone 5) and satisfies the ... These types of airplanes are less likely to penetrate a building or cause major
damage compared to larger ... , whether traffic
conditions cause minor street vehicles undue delay when entering or crossing the major... The majority of reduction primarily would consist of
purchase of offset credits. ..."
Matched in attachment:
"... Losses from used car dealers was
the major factor in the decline from
autos and transportation; new ... $200,000
$400,000
$600,000
$800,000
$1,000,000
$1,200,000
$1,400,000
$1,600,000
SALES TAX BY MAJOR ..."
Matched in attachment:
"... ➔ R7-1 Convene major fleet businesses to identify ways to cost-effectively and efficiently
transition ... Convene major fleet
businesses to identify ways to cost-effectively and efficiently transition heavy ..."
Matched in attachment:
"... EXPERIENCE:
Assistant Planner:
Bachelor’s degree from an accredited college or university with major... Associate Planner:
Bachelor’s degree from an accredited college or university with major coursework ..."
Matched in attachment:
"... The major take-away regarding the availability of grants is that the City must
have a current, adopted ... Central San Rafael Basin- includes San Rafael Canal/Creek and neighborhoods bordering
the creek, and major... This watershed program covers all major developed watersheds in Marin including: San
Antonio/Novato ... The intent of the meeting was to identify the major projects and
priorities in Marin County that the ... A major discussion point was adaptation and sea level rise, and representatives from the
County were ..."
This document presents a “white paper” on the topic of sea level rise. This topic has been a growing concern in the last decade as studies continue to report and confirm its direct connection to climate change associated with global warming. This paper was prepared as a ‘first step’ in responding to the need to...
Matched in attachment:
"... with the
Accounting Manager) oversees the production of all aspects of the CAFR; assists and takes a
major... and ability is:
A Bachelor's degree from an accredited four-year college or university with major ..."
Matched in attachment:
"... The northern Coast Ranges were segmented into a series of tectonic blocks
separated by major faults ... There has also been major climate change and dramatic rising and lowering of sea level. ... This plate displacement produced regional strain that is concentrated along major faults of the
San ... Of the major earthquakes known to have affected the site, the 1906 San Francisco earthquake caused the ... earthquake originating from the major active Bay
Area faults, particularly the nearby San Andreas ..."
Matched in attachment:
"... it is in only
fair condition seismically, meaning that it is likely to suffer moderate damage
in a major... has
been found to be in good condition structurally, however it may suffer moderate
damage under major... The code review includes the design of
the major structural components of the lateral load resisting ... The locations of the properties relative to the major seismic faults in the
bay area was determined ... For major renovation it is
expected the building will be required to meet current city needs. ..."
Matched in attachment:
"... Conceptual Design Review by the San Rafael Design Review Board is required for
development subject to major... This
process is meant to review technical feasibility and to pinpoint major issues that may arise
within ..."
Matched in attachment:
"... three-quarter percent Measure E
transactions and use tax, until needed for planning and construction of and major... accumulating funds to be used for the purpose of non-public safety facility
planning, construction and major... one-third of these tax proceeds) for the purpose of public safety facility
planning, construction and major... reserve is to accumulate funds to be used for the purpose of non-public
safety facility construction and major ..."
Matched in attachment:
"... The CIP is a major element
of the City’s budget, and includes projects that have been evaluated and ... extent appropriate, continue to encourage public participation in the conceptual
design and funding of major... Involve the community in the planning and design of major public
facilities. ... Of the
pump stations, 12 are considered to be major with sizeable tributary service areas,
and 20 are ..."
Matched in attachment:
"... Training:
Equivalent to a Bachelor’s degree from an accredited college or university with major... Training:
Equivalent to a Bachelor’s degree from an accredited college or university with major ..."