Matched in attachment:
"... responses that have been prepared for selected
comment topics to provide a comprehensive analysis of major... responses that have been prepared for selected comment topics to provide
a comprehensive analysis of major... The view through the center of the site is the major public view corridor. ... The neighborhood residents and homeowner associations shall be informed and consulted
on major design ... For this reason, the majority of the
Canalways property has been included as SMHM habitat (see Exhibit ..."
Matched in attachment:
"... The revised PD rezoning must be supported by a majority of the entire Planning Commission (i.e.,
minimum ... of four members and not just a majority of those present). ... The majority of the
property is within the City of San Rafael jurisdiction. ... This will require a major
multi-agency effort. ... site plan and design-related improvements pursuant to Chapter 25 (Environmental
and Design Review of Major ..."
Matched in attachment:
"... Funding
There are currently four major annual funding sources for capital improvements projects. ... The following
table summarizes those four major revenue sources and what categories the funding may ... A failed major storm drain culvert was replaced behind 7 Beechwood Court
last fall. ... Requiring 2/3 majority to pass, Measure
E only received 34% of the vote. ... Some of the balance in the fund is being held in anticipation of
major public right-of-way projects ..."
Matched in attachment:
"... Citibank is located immediately east (and abutting) SMART station
platform and was identified as a major... Identified as a
major TOD opportunity in Downtown Plan. ..."
Matched in attachment:
"... This element identifies the general location of existing and proposed major thoroughfares, transportation ... 6.3: Connectivity - Develop pedestrian and bicycle networks that connect residents and
visitors to major... Implement the major
pedestrian and bicycle pathway, intersection, and lane improvements included in ..."
Matched in attachment:
"... Discussion:
Less than Significant: Potential seismic hazards resulting from a nearby moderate to major... In the event of a
major earthquake in the Bay Area, the site may be susceptible to seismic shaking ... earthquake
originating from the major active Bay Area faults. ... The major arterials nearest to the project site are Francisco Boulevard East, approximately 1,200 feet ... None of the major roadways are a
significant noise source at the project site given their distance ..."