The City Hall building will be closed to the general public on Fridays from June 6, 2025 through August 29, 2025. San Rafael Community Centers, Libraries, Al Boro Parking Services, and all Public Safety services will remain open and maintain normal Friday hours.

 

Search Results

Filters

1646 Results Found

Matched in attachment: "... more of the following: (1) Substantial changes are proposed in the project which will require major ... changes occur with respect to the circumstances under which the project is undertaken which will require major ... The GP EIR determined that in the absence of buffer zones from major mobile sources of toxic contaminants ... restrict the range of a rare or endangered plant or animal or eliminate important examples of the major ..."

Matched in attachment: "... The majority of federal funding for bicycle and pedestrian projects and programs in California comes ... Connectivity – Develop bicycle and pedestrian networks that connect residents and visitors to major ... routes”, including interim connections to Richmond-San Rafael Bridge Complete 15% of proposed “major ... routes”; complete 5% of proposed secondary projects Complete 25% of proposed “major routes”; complete ... secondary projects Complete 45% of proposed “major routes”; complete 20% of proposed secondary ..."

Matched in attachment: "...  Floor swept and clear of major debris and food particles- mop if needed. ..."

Matched in attachment: "... • Assists Mechanics with major repairs. ... • Reports major problems to mechanics or supervisor. • Changes gas, oil and air filters. ..."

Matched in attachment: "... A majority vote of the members present is required to take an action on an item on the agenda, except ..."

Matched in attachment: "... The majority of federal funding for bicycle and pedestrian projects and programs in California comes ... Connectivity – Develop bicycle and pedestrian networks that connect residents and visitors to major ... routes”, including interim connections to Richmond-San Rafael Bridge Complete 15% of proposed “major ... routes”; complete 5% of proposed secondary projects Complete 25% of proposed “major routes”; complete ... secondary projects Complete 45% of proposed “major routes”; complete 20% of proposed secondary ..."

Matched in attachment: "... The majority of the projects are proposed for existing streets that already contain traffic signals, ... The majority of the proposed projects would consist primarily of signing and striping improvements to ... The majority of the proposed projects are proposed for existing developed rights-of-way. ... The majority of the projects are proposed for existing streets that already contain traffic signals, ... The majority of the projects are proposed for existing streets that already contain traffic signals, ..."

Matched in attachment: "... The following list summarizes the major qualitative areas that will be evaluated. ... Describe your relationships and experience with manufacturers and major distribution partners. 6. ..."

Matched in attachment: "... bicycle parking requirements) Wayfinding The Working Group considered recommendations in seven major ... street/metered parking spaces; 19% are spaces in City garages & lots; 56% are spaces in private lots Major ... survey respondents said they park most often on-street; 20% park in public garages Survey showed majority ... either limits their duration or has no effect Some merchants concerned about strict enforcement Majority ..."

Matched in attachment: "... Before they sta1ted the formal planning process, they did a major outreach effort to their sunounding ... With traffic on major roads at or nearly-at capacity during commute hours, even having a few additional ... The cost of buildable property is a major consideration, but in addition, developers face high costs ... Marin County Board of Supe1visors wrote: "Marin County, the ·Marin Community Foundation and the Major ... Police - Given the level of crime in Marin, adding 10-15% to the population would not likely have a major ..."

Matched in attachment: "... Citibank is located immediately east (and abutting) SMART station platform and was identified as a major ... Identified as a major TOD opportunity in Downtown Plan. ..."

Matched in attachment: "... Inviting to people Connecting to community SMART Rail Alignment ( ) Major Pedestrian Route ..."

Matched in attachment: "... Historic resources in Downtown • Downtown merchants and businesses • Downtown service providers • Major ..."

Matched in attachment: "... San Rafael has three types of Design Review Permits; Major, Minor and Administrative- level. ... Major Design Review Permits require review and approval by the Planning Commission at a public hearing ... Some of the common projects types (and related level of review) are as follows:  Major Environmental ... square feet; Sign Programs and Murals; New stand-alone wireless communications facilities (monopoles); Major ... cut or 2000 cubic yards of fill); Modifications to site, landscape, parking or previously approved major ..."

Matched in attachment: "... Consistency While Questions 4 through 7 seemed to provide a positive feel for the process for a large majority ... dissatisfied, the speed of review, information flow, general efficiency, and costs were suggested to be major ..."

Matched in attachment: "... The majority of the trade payables relate to accounts payable on capital projects. ... The primary government is financially accountable if it appoints a voting majority of the organization ... contracts for sewer improvement projects with remaining obligations of approximately $1,300,000, with the majority ..."

Matched in attachment: "... Increases in activity at the County Government Center, a major employment and activity node, is possible ..."

Matched in attachment: "... following findings relating to the Use Permit (UP21-017), Environmental and Design Review (ED21-042), and Major ..."

Matched in attachment: "... $400,000 $600,000 $800,000 $1,000,000 $1,200,000 $1,400,000 $1,600,000 $1,800,000 SALES TAX BY MAJOR ..."

Matched in attachment: "... indicated that the Mall was a logical location for housing, but that design and access/ congestion were major ... 19 Sample Feedback from Workshop Comment Cards* “It was quite clear that the overwhelming majority ... Major points included the need for affordable housing, support for more creative approaches to ... The comments are transcribed below:  It was quite clear that the overwhelming majority here wants ..."

Round 1 Workshops Engagement Summary

Close window