Matched in attachment:
"... Rebar installation for strip and spread footings were completed, inspected,
and poured in place. ... Contractor then followed with the installation of the waterproofing, grout
injection ports, rebar, sleeves ... The IOR, City inspector and the Structural Engineer all have been to the site performing
random inspection ..."