"... fees (fees will vary on case by case basis).
- Re-Inspection Fee (if required) = FBHR minimum ... found in CFC Table 1004.1.1. This determination would be calculated by the Fire Inspector at time ... require an Electrical Permit that is issued through the Building Inspection Division ..."
Matched in attachment:
"... .
-
Re-Inspection Fee (if required) = FBHR minimum one hour. ... This determination would be calculated by the Fire Inspector at time of plan review. ... attached other than direct connect shall require an Electrical Permit that is issued through the Building Inspection ..."
Informational Bulletin – Permit Application Tents and Other Temporary Membrane Structures January 2019 Fire Prevention Bureau Permit Process for Tents and Other Temporary Membrane Structures Complete this document and use it as your permit submittal. Also furnish the following: Flame spread certificates. Proof of Worker’s Compensation. Proof of City business license (may obtain...