What does the pre-construction inspection survey consist of?

Department of Public Works staff will inspect selected program applicants for: 

  • Required sidewalk replacement 
  • Required tree work (root shaving or tree removal) 
  • Sidewalk/Curb-Gutter replacement required 
  • Sidewalk shaving for displacement (for very slight displacements only)

Once the survey is complete, you will be emailed a copy to share with the contractor.