4. Sidewalk shaving done (July – August 2018)

The City shaving contractor went out to 144 properties identified in the City pre-construction inspections as having minor offsets (<1/5″) and eliminated the trip hazards.

  • 80 of these properties needed sidewalk shaving only
  • 64 of these properties needed a mix of sidewalk shaving and sidewalk replacement

This work was done by Precision concrete and at no cost to property owners.