
PG&E’s subcontractor, Pinnacle Power Services, will be working at night to perform overhead maintenance on their electrical facilities. The work is schedule on Friday 5/23 from approximately 10PM to 6AM Saturday May 24. The work requires the power to be shut off and is happening at night to minimize disruption to the surrounding properties. The work will only require a lane closure so traffic will still be able to get through the area. The site contact is Kelly Watson (405) 625-7335