PG&E’s subcontractor, Core Tree Care, will be working at the locations listed below. This work will be done during 12/22 – 12/24 & 12/26. Public inquires can be addressed by the contractor: John Ball, Core Tree Care 559-944-9459. LOT Street 619 Canal St 300 Clorinda Ave 325 Clorinda Ave 21 Clyde Ave 1736 Grand Ave...
PG&E’s subcontractor, Pinnacle Power Services , will be closing the road near 25 Magnolia Ave to replace power poles and perform overhead maintenance in the area. The closure will happen between Tuesday, 12/16 and Thursday, 12-18, between approximately 9am – 3pm. They have an approved encroachment permit EP-25-522 and affected properties have also been notified....
The 2025-2027 Three-Year Plan Pavement Management Plan (“Plan”) is based on a full network inventory and field assessment conducted in late 2024 and early 2025. This assessment included evaluation of pavement conditions, preliminary curb ramp review, and preservation treatment recommendations for each roadway segment in the City’s network. The Plan provides the framework for strategic...
Beginning the week of December 8, 2025, Michael Paul Company will be upgrading the sewer system in the Los Ranchitos Park restroom located at 20 Sequoia Road for the City of San Rafael. Work will take place between the hours of 8am and 5pm, Monday through Friday. The Project should be completed within two weeks...
PG&E’s subcontractor, Pinnacle Power Services , will be closing the road near 49 Marquard Ave to perform maintenance on their overhead utilities. The closure will happen Thursday, 12/4, between approximately 9am – 4pm. They have an approved encroachment permit EP-25-217 and affected properties have also been notified.
On October 24th, 2025, contractor Michael Paul Company, Inc. finished a project to replace 10 feet of 12-inch corrugated metal pipe (CMP) with 12-inch high-density polyethylene (HDPE) pipe at Belvedere St near Louise St. This section of the stormwater pipe was damaged, trapping debris and causing a blockage. The CMP repairs and replacement work is...
PG&E’s subcontractor, Core Tree Care, will be working at the locations listed below. This work will be done the week of 11/3 – 11/7. Public inquires can be addressed by the contractor: John Ball, Core Tree Care 559-944-9459. LOT Street 42 Grove ST. 7 MLISS LN 83 BRET HARTE RD 52 GLENAIRE DR 222-230 REDDING...
PG&E’s subcontractor Pinnacle Power Services will be closing the road near 270 Bret Harte Rd to replace an anchor for the utility pole. The closure will happen Monday, 10/27, between approximately 9am-3pm. They have an approved encroachment permit EP-25-99 and affected properties have been notified.
PG&E’s subcontractor, Core Tree Care, will be working at the locations listed below. This work will be done the week of 10/27 – 10/31. Public inquires can be addressed by the contractor: John Ball, Core Tree Care 559-944-9459. LOT Street 10 LINCOLN CT. 112 K ST. 222 REDDING WAY 46 BLOSSOM DR 21 ST. FRANCIS...