PG&E’s subcontractor, Core Tree Care, will be working at the locations listed below. This work will be done the week of 11/04 - 11/08. Public inquires can be addressed by the contractor: John Ball, Core Tree Care 559-944-9459. LOT Street 2100 4TH ST 2066 4TH ST 2144 4TH ST D 36 W CRESCENT DR...
Pinnacle Power Service, contracted by PG&E, will be closing the road near 58 Bret Harte Ln to replace a power pole and overhead electrical equipment. The road closure will happen Friday, 11/08, between 9am – 4pm. They have an approved encroachment permit EP2409-115 and will have flaggers available to help local traffic through the area.
Community Health and Safety Notice: Landfill Gas Monitoring Bellam Blvd. Landfill aka San Rafael Landfill 31 Windward Way, San Rafael Drilling and Well Installation: July 2024 Monitoring and Sampling: August 2024 through August 2025 On behalf of the City of San Rafael, Haley & Aldrich, Inc. is performing landfill gas monitoring and sampling...
The city of San Rafael's Public Works Department is proud to celebrate October 28th as National First Responders' Day! We'd like to extend a heartfelt thank you to all of our first responders: To our police officers, firefighters, public works professionals, paramedics, communication dispatchers, and other emergency personnel. Thank you for all you do to...
Pinnacle Power Service, contracted by PG&E, will be closing the road near 215 Upper Toyon Dr to perform overhead equipment maintenance. The road closure will happen Wednesday, 10/30, between 9am – 12pm. They have an approved encroachment permit EP2409-094.
The Streets Division crews have been busy preparing San Rafael’s waterways for the 2024/25 rainy season. The crews have been removing debris and sediment caused by last year’s storms and will continue to clean out debris from San Rafael’s waterways, headwalls, and containment basins. This work is vital to ensure the City’s stormwater system is...
Pinnacle Power Service, contracted by PG&E, will be closing the road near 93 Deer Park Ave to replace a power pole and overhead electrical equipment in the area. The road closure will happen Friday, 10/25, between 9am – 4pm. They have an approved encroachment permit EP2409-029.
PG&E will be conducting emergency night work for their underground electric utility starting this evening, Friday 10/18, from 9pm to 5am and may work through Friday, 10/25. They will be working across Kerner and Bellam, and have been advised to take one lane at a time. The site contacts for this job are Oscar Coto...
PG&E’s subcontractor, Core Tree Care, will be working at the locations listed below. This work will be done the week of 10/21-10/25. Public inquires can be addressed by the contractor: John Ball, Core Tree Care 559-944-9459. LOT Street 46 Elizabeth Way 139 Tamal Vista Dr. 114 Bayo Vista Way 15 Quarry Rd. 16 Quarry Rd....
MMWD’s subcontractor, WK McClellan will be performing nightwork near 30 N San Pedro Rd to restore the asphalt from a water leak repair. The night work is scheduled to be on Tuesday, 10/22 from approximately 7 P.M to 12 A.M. Travel lanes are expected to remain open but shifted to accommodate the work area. The...
Striping of the B St intersection was completed on September 25, 2024. Before the striping began, traffic was observed by City staff and discussions were held with the City’s contractor, consultants, and the business owner located near the intersection. All four crosswalks at the intersection were turned into yellow ladder crosswalks to call greater attention...
PG&E’s subcontractor, Core Tree Care, will be working at the locations listed below. This work will be done the week of 10/14-10/18. Public inquires can be addressed by the contractor: John Ball, Core Tree Care 559-944-9459. LOT Street 341 BRET HARTE RD 208 SEQUOIA DR 2066 4TH ST 2144 4TH ST D 2122 4TH ST...
PG&E’s subcontractor, Core Tree Care, will be working at the locations listed below. This work will be done the week of 10/7/24 -10/11/24. Public inquires can be addressed by the contractor: John Ball, Core Tree Care: 559-944-9459. LOT Street City 40 SEQUOIA DR San Rafael 48 SEQUOIA DR San Rafael 19 COTTAGE AVE San...
2024/25 Pavement Maintenance Project The 2024/25 Pavement Maintenance Project is in full swing across San Rafael! This year’s Project includes the removal of existing striping; the placement of crack seal, slurry seal, and fiberized micro-surfacing on various roadways; and the installation of new striping. The City’s Contractor is currently working on the placement of slurry...
PG&E’s subcontractor, Core Tree Care, will be working at the locations listed below. This work will be done the week of 9/30-10/4. Public inquires can be addressed by the contractor: John Ball, Core Tree Care 559-944-9459. LOT Street 1095 LAS OVEJAS 152 MIRAMAR AVE 119 GREENWOOD AVE 106 CLARK ST 6 REDWOOD DR 7 REDWOOD...
PG&E’s subcontractor, Core Tree Care, will be working at the locations listed below. This work will be done the week of 9/23-9/27. Public inquires can be addressed by the contractor: John Ball, Core Tree Care 559-944-9459. LOT Street 70 POPLAR DR 115 CORTE ANITA 45 QUISISANA DR 1 VISTA DR 124 RESERVOIR RD 102 BAY...
Effective September 27, 2024, regular residential street sweeping will stop for the winter months. If you have any questions or concerns, please let us know via our online ticketing system - See Click Fix! (category: Street Sweeping / Barrida de Calle)
Construction on the B Street Culvert Replacement Project is almost complete. The week of September 2, 2024, the contractor formed and poured the sidewalk, driveways, ramp, curb, and gutter. On September 10th, the contractor resurfaced the entire intersection surrounding the new culvert. The contractor demobilized on September 11th. The last item of work is striping,...
PG&E’s subcontractor, Core Tree Care, will be working at the locations listed below. This work will be done the week of 9/16-9/20. Public inquires can be addressed by the contractor: John Ball, Core Tree Care 559-944-9459. LOT Street 155 PEARCE RD 1220 ANDERSEN DR 17 PERRY WALK 217 BUNGALOW AVE 10 MCCOY RD 139 PROSPECT...
PG&E will be closing the road near 377 Margarita Dr to complete power pole and associated overhead maintenance. The road closure will happen Wednesday, 9/18 between 12pm – 4pm. They have an approved encroachment permit from the City, EP2407-010 and notifications have been provided to affected properties.
Pinnacle Power Service, contracted by PG&E, will be closing the road near 366 Margarita Drive to install a pole and anchor. The road closure will happen for about 4 hours Tuesday, 9/10, between 9am – 3pm. They have an approved encroachment permit: EP2405-036.
Pinnacle Power Service, contracted by PG&E, will be closing a portion of Bret Harte Rd between Bret Harte Ln (by 453 Bret Harte Rd) and Southern Heights Blvd. The road closure will happen for about 4 hours Tuesday, 9/10, between 9am – 3pm. They have an approved encroachment permit: EP2407-088.
Pinnacle Power Service will be closing the road near 363 Locust Ave to install a pole and anchor. The road closure will happen for about 4 hours Tuesday, 9/10, between 9am – 3pm. They have an approved encroachment permit: EP2408-003.
PG&E’s subcontractor, Core Tree Care, will be working at the locations listed below. This work will be done the week of 9/9/24 - 9/13/24. Public inquires can be addressed by the contractor: John Ball, Core Tree Care: 559-944-9459. Core Tree Care 09/09-09/13/2024 LOT Street City 352 Summit Ave San Rafael 150 Coleman Dr. San Rafael...
PG&E will be closing the road near 9 Bungalow Ave to complete a pole replacement job. The road closure will happen Friday, 9/6 between 9am – 3pm. They have an approved encroachment permit from the City, EP2311-064, and notifications have been provided to affected properties.
Construction on the B Street Culvert Replacement Project started on July 22, 2024. The section of the current concrete box culvert requiring replacement has been replaced as of August 30, 2024. This week, the contractor will pour the curb, gutter, sidewalk, and ramps. Next week, the contractor will resurface the section of B Street around...
PG&E will be closing the road near 41 Chula Vista Dr to complete overhead electric work and vegetation maintenance. The road closure will happen Wednesday, 9/4/24 between 9am – 3pm. They have an approved encroachment permit from the City, EP2304-028, and notifications have been provided to affected properties.
The team working at the 800 Mission site will be closing one southbound lane on Lincoln Ave between Laurel Pl and Mission Ave until approximately 6pm to remove the crane on site. This is a one time extended land closure for today, 8/28, due to unforeseen delays with the crane removal equipment. Moving forward, lane...
MMWD will be closing the road near 55 Bellevue Ave to repair a leak in the area. The road closure will happen, Thursday, 8/29, between 9am – 3pm. They have an approved encroachment permit EP2408-033 and notifications have been provided to affected properties.
PG&E’s subcontractor, Core Tree Care, will be working at the locations listed below. This work will be done the week of 8/26-8/30. Public inquires can be addressed by the contractor: John Ball, Core Tree Care 559-944-9459. Core Tree Care 08/26-08/31/2024 LOT Street City 37 BRET HARTE LN SAN RAFAEL 5 SIERRA CIR SAN RAFAEL...