Address:
Hetherton St
San Rafael
CA
94901October 24 – October 28: Curb ramp installation along Hetherton Street (nightwork).
November 7 – November 9: Resurfacing.
ACTIVE NIGHT CONSTRUCTION: 8:00pm-5:00am, November 7-9
Posted on October 30, 2016
Address:
Hetherton St
San Rafael
CA
94901October 24 – October 28: Curb ramp installation along Hetherton Street (nightwork).
November 7 – November 9: Resurfacing.
ACTIVE NIGHT CONSTRUCTION: 8:00pm-5:00am, November 7-9