Facility Repairs

Posted on May 8, 2020


Facilities Repairs

Public Works is making the necessary repairs to modular during the COVID-19 pandemic to ensure the safety of our city staff. Water damage in subfloor was detected under this window. All of the compromised areas were removed, replaced and made safe and solid. Exterior siding was removed and an area where water had penetrated was located. Fortunately, there was no damage to the framing of the wall or window. Multiple layers of waterproofing upgrades were installed around window. Improved siding and window trim were installed and painted. This repair was performed using 100% of materials from our stock.

Close window