PG&E’s subcontractor, Core Tree Care, will be working in locations listed below. They will be doing vegetation work along PG&E powerlines on Friday 7/21/2023
| 1200 GRAND AVE |
| 424 MISSION AVE |
| 709 5th Ave |
| 1101 GRAND AVE |
| 520 5th Ave |
| 534 5th Ave |
| 1016 IRWIN ST |
| 1108 Irwin St |
| 1118 IRWIN ST |
| 1818 Irwin St |
| 527 Mission Ave |
| 509 4TH ST |
| 505 Fourth St |
| 1010 Tamalpais Ave |
| 637 5TH AVE |
| 637 5TH Ave |
| 1108 Tamalpais Ave |
| 637 Tamalpais Ave |
| 637 MISSION AVE |
Public inquires can be addressed by the contractor: Core Tree Care (559) 920-9198