City offices will be closed on November 27 and 28 for the Thanksgiving Holiday. Emergency services are available 24/7.
Upcoming community engagement session for the 350 Merrydale Interim Shelter Project on December 9 at Venetia Valley School from 6 p.m. to 7:30 p.m.
B Street will be converted to TWO-WAY Traffic between Second Street and 5th Avenue this Sunday night November 19, 2023. The switchover will take several hours during which the easterly lane will be closed. Work begins at 8 pm and it is expected to take several hours to complete. After the striping, signage, and signal … Continued
A City project will be doing work to improve the storm drains that will require a road closure at 57 Bryn Mawr Dr. This closure is expected to begin Monday, 11/27, from 9am to 3pm and will last about 3 weeks. They will still be doing work in the area from 8-9am and 3-5pm each … Continued
PG&E will be doing pole replacement work that will require a road closure at 121 Tiburon Blvd. The closure will happen on Monday 11/20 and Tuesday 11/21 from 8am to 5pm. This road closure is in the County unincorporated area, but their traffic control and detour signs will be placed in the City right-of-way. They … Continued
West Coast Drilling will be closing the road at 48 El Camino Ave to complete a slope repair project that includes hillside drilling. The road closure will happen Monday 11/13 to approximately Wednesday 11/22. Approved working hours are from 9am to 3pm each day (Mon-Fri). They have an approved encroachment permit (EP2309-064), and they have … Continued
The Marin Endurance Festival will be taking place next weekend, Saturday 10/28 – Sunday 10/29. There will be full road closures on Point San Pedro Rd from San Marino Dr and past Biscayne Dr to extend into the unincorporated areas of San Rafael to the Back Ranch Meadows Campground in China Camp State Park. The … Continued
Precision Crane Service, Inc. and Traffic Management will be temporarily closing C St between 3rd St and 4th St to perform a crane lift for a project at 1299 4th St. The road closure will happen Tuesday, 10/17, from approximately 9am to 3pm. They have an approved encroachment permit (EP2306-081), and they have confirmed that … Continued
West Coast Cranes will be temporarily closing Tamarack Drive between Lenglen Ave and Esmeyer Dr to perform a crane pick for an ADU project. The road closure will happen Thursday, September 7, from approximately 9 A.M. – 12 P.M. They have an approved encroachment permit EP2308-025 and notifications have been provided to affected properties. … Continued
PG&E’s subcontractor, Core Tree Care, will be working in locations listed below. They will be doing vegetation work along PG&E powerlines on Friday 7/21/2023 1200 GRAND AVE 424 MISSION AVE 709 5th Ave 1101 GRAND AVE 520 5th Ave 534 5th Ave 1016 IRWIN ST 1108 Irwin St 1118 IRWIN ST 1818 Irwin St 527 … Continued
PG&E will be temporarily closing St Francis Ln to replace a gas service in the area. The road closure will happen Wednesday, June 28, from approximately 9 A.M. – 4 P.M. They have an approved encroachment permit EP2209-008 and notifications have been provided to affected properties.
PG&E’s subcontractor, Edison Power Constructors, will be working at night to replace power poles near 800 Mission Ave. The night work is schedule for Thursday, 6/22 from approximately 8 P.M to 5 A.M. The work requires power to be turned off in the area and the traffic signal at the Mission Ave & Lincoln Ave … Continued