Category: Everything Traffic

9/9/25: Temporary Road Closure Notification – 1903 5th Ave

Samar Living Inc, will be closing the road near 1903 5th Ave to use a crane to lift an ADU onto the property. The closure will happen Tuesday, 9/9, between approximately 9am – 4pm. They have an approved encroachment permit EP-25-204 and affected properties have also been notified.    

Update: Assembly Bill 43 Speed Limit Sign Update

California Assembly Bill 43 (AB 43), signed into law in October 2021, requires Engineering and Traffic Surveys (E&TS) reports to consider the presence and safety of vulnerable roadway users, such as bicyclists and pedestrians, when establishing speed limits. AB 43 provides local  jurisdictions with more flexibility to reduce speed limits along roadways that meet certain characteristics such as safety … Continued

Road Closure Notification – St Francis Ln – 8/25

PG&E will be working and closing the road on St Francis Ln at Palm Ave to conduct electrical work. The closure will happen Monday, 8/25, between 9am-3pm. They have an approved encroachment permit EP2401-023, and affected properties have been notified. Please note St Francis Ln is a dead-end street, and ends in a cul-de-sac, so … Continued

Emergency Electric Work – 292 Knight Dr – 8/21-8/24

PG&E’s subcontractor, VPI Charge, will be working with a one lane closure at 292 Knight Dr for emergency electrical work in the area. Emergency work is scheduled today, Thursday, 8/21, through Sunday, 8/24, between approximately 8am-4pm. German Prado 925-596-8170 will be the VPI General Foreman. Please contact them with any questions or concerns.

Core Tree Care Work Notification – 8/18-8/22

PG&E’s subcontractor, Core Tree Care, will be working at the locations listed below. This work will be done the week of 8/18-8/22. Public inquires can be addressed by the contractor: John Ball, Core Tree Care 559-944-9459.   LOT Street City 16 ESTATES CT SAN RAFAEL 504 BRET HARTE RD SAN RAFAEL 69 OAK AVE SAN … Continued

Temporary Road Closure Notification – 137 Bungalow Ave – 8/19

PG&E’s subcontractor, Edison Power, will be closing the road near 137 Bungalow Ave to perform overhead electrical maintenance. The closure will happen Tuesday, 8/19, between approximately 9am – 4pm. They have an approved encroachment permit EP2501-075 and affected properties have also been notified.

Temporary Road Closure Notification – 155 Pearce Rd – 8/20

Miller Pacific Engineering will be conducting borings and will be closing the road at 155 Pearce Rd for a City project. Local traffic will be able to maintain access to and from their homes. This closure will happen Wednesday, 8/20 from 8am-4pm. The contractor has an approved permit, EP-25-220. Affected residents have been notified.

Close window