Belvedere St & Louise St – CMP Replacement

Posted on November 7, 2025


picture of CMP work

On October 24th, 2025, contractor Michael Paul Company, Inc. finished a project to replace 10 feet of 12-inch corrugated metal pipe (CMP) with 12-inch high-density polyethylene (HDPE) pipe at Belvedere St near Louise St.

This section of the stormwater pipe was damaged, trapping debris and causing a blockage.

The CMP repairs and replacement work is managed by San Rafael’s Engineering Dept.

Close window