On October 24th, 2025, contractor Michael Paul Company, Inc. finished a project to replace 10 feet of 12-inch corrugated metal pipe (CMP) with 12-inch high-density polyethylene (HDPE) pipe at Belvedere St near Louise St.
This section of the stormwater pipe was damaged, trapping debris and causing a blockage.
The CMP repairs and replacement work is managed by San Rafael’s Engineering Dept.