2023 Sewer Rehabilitation
Project Goals
To complete repair and replacement of deteriorated sewer main, sewer laterals, and manholes.
Budget
Construction | $7,000,000.00 |
Overview
In 2019, the District televised and assessed approximately 11.5 miles of sewer main from 4-inch to 36-inch diameter and manholes throughout central San Rafael near the US Highway-101 and nearby adjacent streets, using the Pipe Assessment Certification Program (PACP) rating system. In 2023, the District entered a Professional Services Agreement with Schaaf & Wheeler to perform an analysis for the 2019 Pipeline Condition Assessment Report, compile a list of sewers recommended for replacement and prepare a set of bid documents.
The project consists of repairing and replacing segments of pipes between manholes, which total approximately 2.7 miles of sewer main. The pipe sizes are 6 and 8 inches in diameter. This project also includes the replacement of 215 laterals and rehabilitation of 76 manholes, located at more than 34 locations across San Rafael. The first area works are below:
- Prospect Drive from intersection with Lincoln to 25 Hammondale Ct and Hammondale Court. Map Link: ProspectDr-HammondaleCt_sewer_repairs
- Wilson Court. Map Link: Wilson Ct_sewer_repairs
- Prospect Drive from 235 to 257 Prospect Drive and back yard of 20 Vineyard Dr to 184 Coleman Dr. Map Link: ProspectDr2_sewer_repairs
- East and South of intersection of Grand Avenue and Prospect Drive. Map Link: ProspectDr-GrandAve_sewer_repairs
- Brookdale Avenue. Map Link: BrookdaleAve_sewer_repairs
Timeline
Bidding | July 2024 |
Construction | September 2024 - August 2025 |
Project Contact
San Rafael Sanitation District
SRSD@cityofsanrafael.org